Navi Mumbai Metro Achieves Historic Milestone
The Navi Mumbai Metro Line-1 (Belapur ↔ Pendhar) has officially crossed 1 crore riders in under two years of operation, marking a historic achievement for the city’s transport system. The line, which was inaugurated in November 2023, has quickly become one of the most preferred modes of travel for residents of Belapur, Kharghar, Taloja, and Pendhar.
Route & Connectivity
- 📍 Route Length: 11.1 km
- 🚉 Stations: 11 modern metro stations
- 🏙️ Connectivity: Links key residential and commercial hubs like CBD Belapur, Sector-7 Kharghar, Sector-14 Kharghar, Panchanand, Taloja, and Pendhar.
- ⚡ Facilities: Fully air-conditioned coaches, smart ticketing, advanced safety systems, and eco-friendly design.
Why Navi Mumbai Metro is a Game-Changer
The success of Line-1 shows how quickly citizens are shifting from road transport to metro travel. With rising traffic congestion on Sion–Panvel Highway and Belapur Road, the metro offers:
✔ Faster travel time
✔ Affordable fares
✔ Eco-friendly transport
✔ Comfortable rides for daily commuters

Ridership Growth
- Inaugurated: November 2023
- Milestone Achieved: 1 Crore riders by October 2025
- Average Daily Ridership: 40,000–50,000 passengers (approx.)
This growth reflects how Navi Mumbai is embracing metro connectivity, similar to Mumbai Metro’s success.
What’s Next for Navi Mumbai Metro?
CIDCO is already working on expanding the network with Line-2, Line-3, and Line-4, which will further connect Navi Mumbai with Panvel, Navi Mumbai International Airport, and Thane. Once fully operational, the metro network will transform Navi Mumbai into a modern smart city with world-class infrastructure.
Conclusion
The 1 crore ridership milestone in less than two years proves that Navi Mumbai Metro Line-1 is not just a transport project but a lifeline for thousands of daily commuters. With further expansions, the metro system will continue to redefine mobility, reduce traffic, and make Navi Mumbai a more sustainable and connected city.
❓ Frequently Asked Questions (FAQ) about Navi Mumbai Metro Line-1
Q1. When was Navi Mumbai Metro Line-1 inaugurated?
👉 Navi Mumbai Metro Line-1 (Belapur to Pendhar) was inaugurated in November 2023.
Q2. How many passengers has Navi Mumbai Metro Line-1 served so far?
👉 The line has crossed the milestone of 1 crore riders in less than two years of operation (by October 2025).
Q3. How long is Navi Mumbai Metro Line-1 and how many stations does it have?
👉 The line is 11.1 km long and has 11 stations, connecting Belapur, Kharghar, Taloja, and Pendhar.
Q4. What are the benefits of Navi Mumbai Metro for daily commuters?
👉 Faster travel, affordable ticket fares, eco-friendly transport, modern facilities, and reduced road congestion.
Q5. What are the future expansion plans of Navi Mumbai Metro?
👉 CIDCO is planning additional lines – Line-2, Line-3, and Line-4 – which will connect more areas of Navi Mumbai, Panvel, Thane, and the upcoming Navi Mumbai International Airport.
Q6. How many people use Navi Mumbai Metro Line-1 daily?
👉 On average, 40,000–50,000 passengers use the metro every day.